Fiberglass

 

Beginning


During

During


 


Finished


 

New Fiberglass Deck

After the deck of this 32’ Chinook Bristol Bay Fisher was removed, a new fiberglass deck was installed and finished with a gel-coated, non-skid surface. The fishing vessel’s fish hold walls were removed and modified for a spray brine system. Additional work included installation of a new 30-gallon water tank and the removal, fabrication and installation of two new aluminum fuel tanks. An eight-inch bow thruster was also part of the upgrade.

 

 

 

 

 

 

 

 

Platypus Marine, Inc. - a full service shipyard | About Us | Contact Us |