• (360) 417-0709
    info@platypusmarine.com
    Lat: 48.07.22 N, Long: 123.26.40 W

  • Category Archives: Military

    United States Army Mulberry ST 914

    United States Army Mulberry ST 914 was recently launched and put back in service, ahead of schedule and within budget. The hardworking vessel was hauled out at the Platypus Marine shipyard for an extended period and had major dry dock … Continue reading

    United States Army Schoharie ST 905

    United States Army Schoharie ST 905 was recently launched and put back in service, ahead of schedule and within budget. She was hauled out at the Platypus Marine shipyard for an extended period and had major dry dock repairs performed. … Continue reading

    USN YC-1636 – Complete Overhaul

    USN YC-1636 , a 110′ barge was hauled out at Pacific Northwest Shipyard for an extensive dry dock period. Platypus Marine Workers removed wildlife growth, rubber fenders and expired zinc anodes to prepare for exterior sandblasting. During the same time frame, … Continue reading

    USN UFDD-40 and UFDD-117

    USN UFDD-40 and UFDD-117 , were hauled out at Platypus Marine for their scheduled extensive drydock period. While being located at the indoor shipyard, the following work included but was not limited to, removing old wildlife growth, along with the  rubber fenders … Continue reading

    USN YC 1624

    USN YC 1624 – was recently hauled out into Platypus Marine Shipyard for an extensive drydock period. Repairs and procedures included but were not limited to sandblasting the from top to bottom and having the rubber bracket bars straightened and repaired … Continue reading

    USN Logistical Escape Trunks 2016

    USN Logistical Escape Trunks 2016 –  were transported into Platypus Marine Shipyard for their restoration. The L.E.T’s were sandblasted from top to bottom along with having its old hardware replaced with its stainless steel counterparts. Platypus Marine Technicians also fabricated and installed … Continue reading

    USCG WAHOO

    USCG WAHOO – The 87’ United States Coast Guard Cutter “WAHOO” was recently launched and put back in service, ahead of Schedule and within budget. She was hauled out at the Platypus Marine shipyard for an extended period and had major … Continue reading

    USCG Osprey

    Osprey is a USCG cutter that was hauled out at Platypus Marine for an extensive overhaul. While dry-docked in Port Angeles the Hardworking vessel had the following repairs included but were no limited to the amount of work accomplished. The … Continue reading

    USN LCM 3 – Overhaul

    The United States Navy LCM 3 was recently hauled out at Platypus Marine Shipyard for extensive repairs. The hardworking vessel was sandblasted from top to bottom, and had all of its hardware removed and replaced with its new stainless steel counterparts. … Continue reading

    USCG “Blackfin” and “Dorado”

    The 87’ United States Coast Guard Cutter “Blackfin” and “Dorado” were recently launched and put back in service, ahead of schedule and within budget. They were hauled out at the Platypus Marine Shipyard for an extended period and had major dry … Continue reading

    USCG Hawksbill

    The 87’ United States Coast Guard Cutter “Hawksbill” was recently launched and put back in service, ahead of Schedule and within budget. She was hauled out at the Platypus Marine shipyard for an extended period and had major dry dock repairs … Continue reading

    USCG Sea-Lion – Engines Repowered

    The 87’ United States Coast Guard Cutter “Sea-lion” was recently launched and put back in service, ahead of Schedule and within budget. She was hauled out of Platypus Marine shipyard for an extended period and had major Re-Power performed to the … Continue reading

    USN YC-1570

    USN YC-1570 – The United States Navy’s YC-1570 Barge was recently hauled out into Platypus Marine Shipyard. Repairs and procedures included but not limited to priming and painting the top coat, bottom painting the hull and applying nonskid to the deck. … Continue reading

    YTB 863 Pokagon

    YTB 836 POKAGON a 108’ Heavy Tug, was hauled out at the Platypus Marine shipyard for an extended period and had major dry dock repairs performed. Work included, but was not limited to: generator extraction and new installation, reconfigured electrical … Continue reading

    USN 64109 -GFE Collar Installation

    USN 64109, a 63 foot Gladding Hearn, a Coast Guard escort vessel, was hauled out for work on the vessels port and starboard Collars. The Collars were removed and were replaced with new GFE Collars. In addition, the bow Collar … Continue reading

    USCG Terrapin

    USCG Terrapin – The 87’ United States Coast Guard Cutter Terrapin was recently launched and put back in service, ahead of Schedule and within budget. She was hauled out at the Platypus Marine shipyard for an extended period and had major … Continue reading

    USN YFN 1489

    USN YFN 1489 Barge was recently hauled out into our Shipyard. It was sandblasted from top to bottom and had all of its hardware removed and replaced with new stainless steel hardware. The hull rubber bracket bars were straightened and repaired. … Continue reading

    USCG Swordfish

    The 87’ United States Coast Guard Cutter “Swordfish” was recently launched and put back in service, ahead of Schedule and within budget. She was hauled out at the Platypus Marine shipyard for an extended period and had major dry dock repairs … Continue reading

    USN YC 1490

    The United States Navy’s YFN-1490 Barge was recently hauled out into our Shipyard. It was sandblasted from top to bottom and had all of its hardware removed and replaced with new stainless steel hardware.The hull rubber bracket bars were straightened and … Continue reading

    United States Navy (L.E.T’s)

    The United States Navy’s Logistic Escape Trunks were transported into Platypus Marine Shipyard for the final parts of their construction. They were sandblasted from top to bottom and had all of its hardware removed and replaced with new stainless steel hardware. In addition … Continue reading